Screw gearbox control unit

Task

Screwing the control unit and bell to the gearbox. A total of 15 screw connections must be made on the control unit, for the rework of which a separate handling device must be used. In addition, the bell must be screwed to the gearbox. All work takes place in one station under cramped conditions.

Special feature: 15-fold adaptation

Torque: 15x 55Nm

Payload: 150 kg

 

handy-lift

Equipment
Equipment
1
Column frame
2
handy-lift 1500
3
handy-flex 200
4
carbo-arm 055m

handy-lift

Equipment
Equipment
1
crane rail
2
trolley
3
carne bridge
4
Locking parking position mechanical
5
Fall protection with pulley
6
Weight compensation
7
Adaptation system handy-lift

Adaptation system

Equipment
Equipment
1
Operating handle
2
Feed Z-axis pneumatic

handy-flex

Equipment
Equipment
1
handy-flex 200
2
Weight compensation
3
Displacement measuring system rotary axis
4
Displacement measuring system horizontal
5
Retraction spring-loaded
6
Clamping piece
7
Parking position magnetic
8
Clamping console

carbo-arm

Equipment
Equipment
1
crane rail
2
Locking parking position mechanical
3
Locking screwing position mechanical
4
Energy supply
5
Weight compensation
6
Displacement measuring system swivel axis
7
Displacement measuring system Z-axis
8
carbo-arm 055m
9
Clamping piece

Further System solutions

Battery assembly

Battery assembly

Battery assembly

Battery assembly

Battery assembly

Battery assembly

Item added to quote!