Task
Bolting the stabilizer to the rear axle carrier. The system must be designed as a semi-automatic system. Delivery in the Z-axis is pneumatic. The adaptation must be pinned on the rear axle carrier. Bolting is carried out with two spindles per side with pneumatic feed. After bolting, the system moves back to the park position in the Z-axis.
Special feature: Semi-automatic
Torque: 4x 48Nm
Payload: 60 kg
handy-lift
Adaptation system









