Final Assembly of Wheels on Front and Rear Axles

Task

Tightening the wheels on the front and rear axles.
Five bolts must be tightened simultaneously. The handling device is manually guided by the operator to the tightening point, the tightening process then proceeds semi-automatically until returning to the parking position.
Visual display of the tightening process result with a visu-box.

Special feature: Semi-automatic, 5-fold

Torque: 5×175 Nm

Payload: 80 kg

 

handy-lift

Equipment
Equipment
1
Crane rail
2
Energy guiding
3
Crane bridge
4
Friction wheel drive
5
Pneumatic feed rate
6
Telescope with weight compensation
7
Screwdriver drum

Adaptation system

Equipment
Equipment
1
Pneumatic weight compensation
2
Fall protection
3
Position query
4
Visualization
5
Lighting
6
Start handle
7
5-fold design
8
Socket with protective sleeves
9
Centering

Further System solutions

Axle assembly

Battery assembly

Gearbox assembly

Motor assembly

Installation preparation

Final assembly

Item added to quote!