E-motor air conditioning compressor and cooling pipe on e-motor

Task

Four screws must be screwed in simultaneously. The handling device is guided manually by the operator to the screwing point, and the screwing process then takes place semi-automatically until it returns to the parking position. Neither a steel structure nor a rail system is available; a free-standing design is required. The cooling pipe is screwed in manually in the same station, without recording the torque.

Special feature: Semi-automatic

Torque: 4x 50Nm

Payload: 50 kg

Manual workstation

Equipment
Equipment
1
Stand
2
handy-lift 500
3
roller-unit

handy-lift

Equipment
Equipment
1
handy-lift 500
2
Pneumatic weight compensation
3
Position query
4
Pneumatic clamping unit
5
Adaptation system handy-lift
6
Protector
7
Operating handle

Adaptation system

Equipment
Equipment
1
Washer
2
Free-turning protective sleeve
3
Energy supply

handy-flex

Equipment
Equipment
1
Weight compensation
2
Position query parking position
3
Free-turning protective sleeve
4
Parking position bracket

Further System solutions

Battery assembly

Battery assembly

Battery assembly

Battery assembly

Battery assembly

Battery assembly

Item added to quote!